Answer:
1, 3, 19, 57, 361, and 1083.
Step-by-step explanation:
Answer:
The number of FTE needed to be hired to cover the additional procedures per 7.5 day work is:
= 1.
Step-by-step explanation:
a) Data and Calculations:
Endoscopies EP Studies Total
Projected number of studies 60 5 65
Time in minutes for per study 5 15
Total time required (in minutes) 300 75 375
Full-time Employee (FTE) works 7.5-hour day or 450 minutes (7.5 * 60) per day.
b)The number of full-time employees (FTE) needed to be hired to cover the additional procedures per 7.5-day work is 1. The FTE has 450 minutes available for the additional procedures. She will only require 375 minutes. Therefore, she has extra (idle) time of 75 (450 - 375) minutes per workday.
Answer:none
Step-by-step explanation:
You must mean 64 instead of 46.Because 29+20+15=64 but none would agree to dislike both popcorn not peanuts.
Step-by-step explanation:
No of pieces John has = 240
No of pieces Stephen has = twice of Johns sweet = 240 x 2 = 480
No of pieces John Sister has = half of John's sweet = 240 ÷ 2 = 120
Total sweets = 240 + 480 + 120 = 840