Answer:
A 2√2(cos 7π/4 + i sin 7π/4)
Step-by-step explanation:
A. 2√2(cos 7π/4 + i sin 7π/4)
2 sqrt(2) ( sqrt(2)/2 - sqrt(2)/2 i)
Distribute
2-2i
This is in the fourth quadrant
B. 2√2(cos 150° + i sin 150°)
2 sqrt(2) (-sqrt(3)/2 +1/2i)
-sqrt(6) +sqrt(2) i
This is in the third quadrant (NO)
C. 2(cos 7π/4 + i sin 7π/4)
2( ( sqrt(2)/2 - sqrt(2)/2 i))
sqrt(2) - sqrt(2) i
This is the fourth quadrant
D. 2(cos 90° + i sin 90°)
2(0+i)
2i
This is on the positive y axis NO
Now we need to decide between the two in the fourth quadrant.
The point has an x coordinate of 2 and a y coordinate of -2
This aligns with point A
Given that the method of revenue calculation is straight line method, the equation modeling this will be given by:
y=mx+c
where:
m=slope
x=time
c=initial value.
from our question:
slope,m=$7000
time=T
y(x)=R(t)
hence the formula after the sixth month will be:
R(t)=7000T+45000
Answer:
The answer is below
Step-by-step explanation:
Given that:
mean (μ) = 70 years, standard deviation (σ)= 5.5 years.
a) The z score measures how many standard deviation a raw score is above or below the mean. It is given as:
, for a sample size of n, the z score is: 
Given a sample of 5 turtles, we have to calculate the z score for x = 60 and x = 80.
For x = 60:

For x = 80:

The probability that a mean life of a random sample of 5 such turtles falls between 60 and 80 years = P(60 < x < 80) = P(-4.07 < z < 4.07) = P(z < 4.07) - P(z < -4.07) = 1 - 0 = 1 = 100%
b) The z score that corresponds to top 10% is -1.28.

Answer:
y= total cost
x= per person
y=10x+a
well we know this equation so
32.25=10(3)+a
a=2.25
Step-by-step explanation:
Answer:
all real numbers
Step-by-step explanation:
the domain will always be all real numbers