Answer:
b. 2
Explanation:
The computation of the money multiplier is shown below:
Money multiplier is
= (1 + currency deposit) ÷ (reserves + currency deposits)
= (1 + 0.80) ÷ (0.10 + 0.80)
= 1.8 ÷ 0.9
= 2
hence, the money multiplier is 2
Therefore the correct option is b. 2
We simply applied the above formula so that the correct value could come
And, the same is to be considered
Answer:
The answer is B. -97.7.
Explanation:
As the question gives us the spot rate, the interest rates of two countries, We can apply the covered interest parity to calculate the 90-day forward exchange rate JPY/AUD from which 90-day forward points can be derived.
F = S x ( 1+ Rjpy) / ( 1+ Raud); in which Rjpy denoted as JPY interest rate ( 0.15% per annum) while Raud is AUD interest rate ( 4.95% per annum).
F = 82.42 x (1+ 0.15% x 90/360) / ( 1 + 4.95% x 90/360) = 81.443
=> The 90-day forward points is : 100 x ( F-S) = 100 x ( 81.443 - 82.42) = -97.7
None of the above
Explanation: The network structure is a newer type of organizational structure viewed as less hierarchical (i.e., more "flat"), more decentralized, and more flexible than other structures. In a network structure, managers coordinate and control relationships that are both internal and external to the firm.
Answer:
January 2, 2020
Dr Cash $52,000
Cr Sales Revenue $52,000
December 31, 2020
Dr Warranty expense $890
Cr Cash $890
December 31, 2020
Dr Warranty expense$640
Cr Warranty Liabiltiy $640
Explanation:
Preparation of the journal entry to record this transaction on January 2, 2020, and on December 31, 2020.
January 2, 2020
Dr Cash $52,000
Cr Sales Revenue $52,000
December 31, 2020
Dr Warranty expense $890
Cr Cash $890
December 31, 2020
Dr Warranty expense$640
Cr Warranty Liabiltiy $640