Answer:
16.99%
Explanation:
Calculation for the crossover rate
We are going to to calculate the crossover rate using cash flow function on a financial calculator by following the step below:
CF0= 0
Step 1
C01=Project A year 1 -Project B year 1
C01=$28,300-$36,900
C01= -$8,600
Step 2
C02=Project A year 2 -Project B year 2
C02=$31,500-$40,500
C02= -$9,000
Third step
C03=Project A year 3
C03=$22,300
Last step
Press CPT key in order for IRR(INTERNAL RATE OF RETURN) to be display
Hence:
Crossover rate=16.99%
Therefore the Crossover rate will be 16.99%
Answer:
Traditional Women
Explanation:
The reason is that the women who take the responsibility of taking care of their house and children represents the traditional class of women. These women are also known as house wife in our society. In this question, Catherine takes the role and responsibility because she takes care of her family and house related issues which matches the role and responsibilities of a traditional women so this is the Traditional women is the right answer.
Total Asset Turnover -Net sales / Revenue divided by Average Total Cost
Explanation:
Total Asset turnover helps to know :-
1. Financial Condition - Which means how much profit the company has earned and what are there Retained Earnings.
2. Desirable Ratios - Depending upon the company type and size ratios are decided which helps them to make a standard comparison.
Total Asset turnover helps to compare the efficiency of the company through figures which would give them a direction to increase there sales volume.
Answer:
a. Potential Packing Output/hr = (50 loaves/20 min) * 60 min = 150 loaves.
However, the production of 50 loaves takes 60 mins, so the packaging remains idle for 40 mins and the Actual Packing Output/hr = 50 loaves.
Hence, Capacity Utilization = (Actual Output/Potential Output) *100% = (50/150)*100% = 33.33%
b) Production output = 50 loaves/hr = 50 loaves/60 mins
Packing Output = 50 loaves/20 mins
So, to make both the capacities equal, the XYZ Bakery can simultaneously operate three batches to prepare the dough and bake i.e 150 loaves/60 mins for both production as well as packing.