Answer:
SELECT y=3x - 8 and y= 5x -8 and y=2x -8 and y = 1/3x -8
Step-by-step explanation:
The y-inercept is the number after the x so y= mx + c
m as in gradinet
and c as in y-intercept (the point where the graph passes the y-axis)
Answer:
Equifax, Experian, and TransUnion.
Step-by-step explanation:
Answer:
Work done is the product of distance and force, it is measured in joules.
Power is the rate of work done given by dividing the work done by time
Power (watts)= workdone (J)/ time (s)
= 50,000J/7 sec
= 7142.857 watts
Therefore, the power of the car during the race was 7142.857 watts
Step-by-step explanation:
37.6*0.9=33.84+4^5=1057.84/16=66.115
38%*25=9.5
66.115-9.5=56.615
ANSWER=56.615
Can anyone help me with my question, because no one is helping me