Answer:
y = 5x
Step-by-step explanation:
y = 5x where x is the number of questions answered correctly
The answer is 7x = 6(x + 15)
x - Jim's rate
y - Pete's rate
<span>Jim completed half the floor in 7 hours: 7x = half of the floor
</span><span>Pete completed the other half of the floor in 6 hours: 6y = half of the floor
So: 7x = 6y
</span><span>Pete can lay 15 more tiles per hour than Jim: y = x + 15
</span>7x = 6y
y = x + 15
Substitute the second equation into the first one:
7x = 6(x + 15)
Answer:
30
Step-by-step explanation:
i did the math lol
About 5 or 4.9 is the estimation
X is the number of movies for the cost of the plan to be the same.
4.25x=36+3.5x
4.25x-3.5=36
0.75x=36
x=36/0.75
x=48