Answer: ok so if you look at the difference it is 120 in 2 hours so to find 1 hour you divide it by 2, or split it in half and that means 60 and it is Decreasing so c is the answer. As for what y= it is y=-60x+480
60 cubic feet and you start out with 480
Step-by-step explanation:
120/2=60
decreasing
c
And y=-60x+480
Answer:Kyle’s claim is not reasonable
Step-by-step explanation:
Total length of the string of the necklace that Kyle covered with black beads is 5/8.
Total length of the string of the necklace that Kyle covered with white beads is 1/4.
Total length of the string of the necklace that Kyle covered with black beads and white beads is would be
1/4 + 5/8 = 7/8 = 0.875
Kyle thought that he will cover 6/12 of the string with beads. 6/12 = 0.5
It means that he covered more than 6/12. Kyle's claim was wrong
The worng answer is [b]
hope this helps you
have a great day
The is increasing by 2 3/8
So the answer is 12 3/4 miles on Friday
Hope this helps :)
A. (4)5 x (4)4 = 36 OR 4(5 x 4) = 36
b. No you would not. 5(5 x 4) = 45 which is out of your budget.