If you draw more of those triangles, there will be 6 that can fit, so find area of 1 triangle and multiply it by 6. Write that number down and then do Pi r squared to find the area of the circle, then do circle area minus triangles area when you get that, divide it by 6. That is the area of the white region so then do Pi R squared again and then subtract the white area from that
Answer:
It's the PURPULE one
Step-by-step explanation:
BTW can u pls help me in my question thanks
35 which is slope which in turn represents the speed.
Answer:
The critical value is T = 1.895.
The 90% confidence interval for the mean repair cost for the washers is between $48.159 and $72.761
Step-by-step explanation:
We have the standard deviation for the sample, so we use the t-distribution.
The first step to solve this problem is finding how many degrees of freedom, we have. This is the sample size subtracted by 1. So
df = 8 - 1 = 6
90% confidence interval
Now, we have to find a value of T, which is found looking at the t table, with 6 degrees of freedom(y-axis) and a confidence level of
. So we have T = 1.895, which is the critical value.
The margin of error is:

In which s is the standard deviation of the sample and n is the size of the sample.
The lower end of the interval is the sample mean subtracted by M. So it is 60.46 - 12.301 = $48.159
The upper end of the interval is the sample mean added to M. So it is 60.46 + 12.301 = $72.761
The 90% confidence interval for the mean repair cost for the washers is between $48.159 and $72.761
What do u need help with what the math problem??!?
I am willing to help if I can