1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Sati [7]
3 years ago
12

One division of a large defense contractor manufactures telecommunication equipment for the military. This division reports that

12% of non-electrical components are reworked. Management wants to determine if this percentage is the same as the percentage rework for the company’s electrical components. The Quality Control Department plans to check a random sample of the over 10,000 electrical components manufactured across all divisions. The 95% confidence interval based on this data is .0758 to .1339. Should management conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components?
Mathematics
2 answers:
Dmitry [639]3 years ago
8 0

Answer:

We can not conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components.

Step-by-step explanation:

The 95% confidence interval tells us that the true mean of the percentage of rework for electrical components is between 0.0758 (7.58%) and 0.1339 (13.39%), with a degree of confidence of 95%.

The value reported of 12% is included in this interval, so it is possible that the true mean for this value is 12%. In other words, we can not reject the hypothesis that the true percentge of rework is 12%.

Then, we can not conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components.

Zielflug [23.3K]3 years ago
6 0

Answer:

At the 95% confidence level, management should not conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components, since the upper bound of the confidene interval, which is 0.1339, is higher than 0.12.

Step-by-step explanation:

To reach a conclusion, we have to observe the confidence interval.

Should management conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components?

Is the upper bound of the confidence interval lower than 12% = 0.12?

If yes, it should conclude that this percentage is lower.

Otherwise, it cannot conclude.

Confidence interval:

0.0758 to 0.1339

0.1339 is higher than 0.12.

So.

At the 95% confidence level, management should not conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components, since the upper bound of the confidene interval, which is 0.1339, is higher than 0.12.

You might be interested in
Solve x - 6 = -12 A) -18 B) -6 C) 2 D) 6
asambeis [7]
The answer would be -6 or letter B because
x - 6 =   - 12 \\ x - 6 + 6 =  - 12 + 6 \\ x =  - 6
8 0
3 years ago
Read 2 more answers
only 6 of the 75 trees in the park are at leat 30 feet tall. what percent of the trees are over 30 feet?
ipn [44]

Answer:

   8 %

Step-by-step explanation:

To find the percent of trees that are over 30 ft tall, take the number of trees that are over 30 ft tall over the number of tree

Percent = trees over 30 ft tall/ total number of trees

              = 6/75

              =.08

Change this to a percent by multiply by 100%

             .08 * 100%

                    8 %

4 0
3 years ago
What percent increase is 21% over 76%
Neporo4naja [7]
Answer:= 261.905% increase

Solution:
Calculate percentage change
from V1 = 21 to V2 = 76
(V2−V1)|V1|×100
(V2−V1)|V1|×100
=(76−21)|21|×100
=(76−21)|21|×100
=5521×100
=5521×100
=2.61905×100
=2.61905×100
=261.905%change
=261.905%change
=261.905%increase
3 0
3 years ago
M×10-m×2=8 idk what m is help
Zanzabum
M would be 1 because 1 x 10 would be 10 and 1 x 2 would be 2. 10-2=8! I hope it helps! chyna♡
4 0
3 years ago
Answer please thanks
tiny-mole [99]
The area of this composite figure is 533 square inches.
The formula for a rectangle is lw, and the formula for the area of a triangle is 1/2bh. After plugging the values into these formulas, we have to add the values all together to get the final area.
3 0
3 years ago
Read 2 more answers
Other questions:
  • ANSWER PLEASE I WILL GIVE U BOUNUS POINTS!!Bob drinks 3 1/2 liters of tea every 2/3 of an hour. Bob drinks at a constant rate
    10·1 answer
  • Which mathematician won the novel prize for literature?
    12·2 answers
  • HELP!! I NEED THIS FAST!!!
    15·1 answer
  • In ∆ABC, the median AM (M ∈ BC ) is perpendicular to the angle bisector BK (K ∈ AC ). Find AB, if BC = 12 in. Show with work
    12·1 answer
  • X+12x-13 = 0 and azo, what<br>is the value x+lo?​
    8·1 answer
  • What is, 3 to the power of 2, times, 3 to the power of 5.
    11·1 answer
  • Find the missing side length
    13·1 answer
  • Pls help <br> escape room question 3
    7·1 answer
  • Solve for y: 7+ 2(x + y) = 11
    10·1 answer
  • What is the value of x?
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!