Answer: 46,000
Step-by-step explanation:
1 1/<span>200 should be the answer</span>
Answer:
Part a) We should try to eliminate the y's because the coefficients are the same
Part b) The solution is the point (6,-9)
Step-by-step explanation:
Part a) Which variable pair should we try to eliminate?
we have
----> equation 1
----> equation 2
Solve by elimination
We should try to eliminate the y's because the coefficients are the same
Part b) What is the solution to the system?
Multiply equation 2 by -1 both sides

-----> equation 3
Adds equation 1 and equation 3

Find the value of y
![8x+2y=30[/tex[tex]8(6)+2y=30](https://tex.z-dn.net/?f=8x%2B2y%3D30%5B%2Ftex%3C%2Fp%3E%3Cp%3E%5Btex%5D8%286%29%2B2y%3D30)


The solution is the point (6,-9)
Answer:
71.5
Step-by-step explanation:
x+1 so (1+10) x (21+5)= 286
but then 1+1=2 and 2x2= 4 so 286 divided by 4= 71.5
Answer:
0.3075 = 30.75% probability that a person will wait for more than 7 minutes.
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
The standard deviation is the square root of the variance.
In this problem, we have that:

Find the probability that a person will wait for more than 7 minutes.
This is 1 subtracted by the pvalue of Z when X = 7. So



has a pvalue of 0.6915
1 - 0.6915 = 0.3075
0.3075 = 30.75% probability that a person will wait for more than 7 minutes.