$26880 , A condominium is a type of ownership arrangement in which a single building is divided into a number of different units, each of which is separately owned, and which are surrounded by jointly held common areas.
<h3>What is condominiums?</h3>
A condominium is a type of ownership arrangement in which a single building is divided into a number of different units, each of which is separately owned, and which are surrounded by jointly held common areas. The phrase can be used to describe both the entire structure or complex and each individual unit therein.
320*12=3840
3840*7=$26880
A condo, often known as a condominium, is a type of housing or residential complex that consists of distinct units, each of which is owned by a different person. A condo is rented directly from the condominium owner when it is rented.
Ownership is the main distinction between a condo and an apartment. Apartments are characterized as rented homes, frequently found in larger residential buildings. Condos are similar to apartments in structure and are typically apartments within larger residential buildings, but condos are owned rather than rented.
To learn more about condominium refer to:
brainly.com/question/1167654
#SPJ4
Answer:
The answer is D, Execution System.
Explanation:
Supply chain Execution system is a system that ensures the delivery of materials or orders to the concerned departments. So in this example, when a company is having difficulty with timely delivery of parts to its manufacturing plants, the company should implement the Supply Chain Execution System in order to ensure the timely delivery of the material to the manufacturing plant of the company.
C. prototyping, does it makes sense now.
Answer:
5.52%
Explanation:
Calculation to determine the current yield
Current yield = ($26.00 × 2)/$941.35
Current yield=$52/$941.35
Current yield= .0552*100
Current yield= 5.52%
Therefore the Current yield is 5.52%
Answer:
Budgeted overhead cost =$1,250,000
Explanation:
Budgeted overhead for the month of September = Total labour hours × overhead rate per hour
Total labor hours = standard hours × budgeted production units
=2.5 hours × 40,000= 125,000
Budgeted overhead cost Total = $10× 125,000
=$1250000
Budgeted overhead cost =$1,250,000