(2,5) equal 10
(-4,9) equal 5
But if you were taking away 10 - 5 equal 5
Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42
1/6 because there are 6 numbers on that die and there is only one 5
Answer:
The detailed derivation is shown in the attachment
Step-by-step explanation:
The step by step explanation is as shown in the attachment.
Basically, what was applied is the knowledge of differentiation and integration.
What factors of 24 are multiples of 3?
3,6,12,24