Answer:
15
Step-by-step explanation:
PERT estimate is a measuring strategy that is based on a weighted average. It is used in measuring the uncertainty and risk via three estimates to determine an estimated likelihood for a project's cost or period of completion.
The formula is (O + 4M + P) ÷ 6
Where P is the most pessimistic = 29
M is the most likely = 12
O is the most optimistic = 10
Hence we have (10 + [4*12]+ 29) ÷ 6
= (10 + 48 + 29) ÷ 6
= 87÷6 = 14.5 ≈ 15
Rounded figure is equal to 15.
Hence the final answer to the question is 15
8k-4k+4+7-k =
8k-4k-k+4+7 =
3k+11
If you are looking for the value of N, multiply both sides by 4. The value of N is 4900.
Lan is 146 centimeters tall now.
<u><em>Explanation</em></u>
Let, Lan's current height is
centimeters
As Lisa is 6 centimeters taller than Lan and Lan is 10 centimeters taller than Jim, so Lisa's current height =
centimeters and Jim's current height =
centimeters.
Every month, their heights increase by 2 centimeters.
So, after 5 months.....
Lan's height =
centimeters,
Lisa's height =
centimeters and
Jim's height =
centimeters
Given that, the sum of Ian's and Jim's heights will be 140 centimeters more than Lisa's height in 5 months. So the equation will be....

So, the current height of Lan is 146 centimeters.