Given that the metal strip is being installed around a bench that 6ft long 2ft wide. The metal required will be given by:
P=4(L+W)
=4(6+2)
=4(8)
=32 ft
Therefore we conclude that we need a metal strip that is 32ft long
(-7)*(2/5 + (-3/7))
= -14/5 + 3
=1/5
It would cost $35 because 10.50 divided by 3 = 3.5x10=35
If you want to make it so that you work most of the hours on the first 4 days, you should work 5 hours. 5*4=20, so 1 hour would be left over on the 5th day.