I set it up as a ratio with hours on the top and the fraction of the job on the bottom. It looks like this: 5/(2/3) / x/1, because 1 is the whole job if 2/3 is only a fraction of it. Cross multiplying gives you 2/3x = 5. Solving for x gives you that it will take 7.5 hours to complete a whole job if it takes 5 hours to complete 2/3 of it.
The answer is C because 48.9 multiplied by 21.2 is 1036.68
<h2>
Hello!</h2>
The answers are:

<h2>
Why?</h2>
Since we are given the margin of error and it's equal to ±0.1 feet, and we know the surveyed distance, we can calculate the maximum and minimum distance. We must remember that margin of errors usually involves and maximum and minimum margin of a measure, and it means that the real measure will not be greater or less than the values located at the margins.
We know that the surveyed distance is 1200 feet with a margin of error of ±0.1 feet, so, we can calculate the maximum and minimum distances that the reader could assume in the following way:


Have a nice day!
It has to be 36 because it the same stick as the other stick that is telling 36
Answer:
150 degrees
Step-by-step explanation:
Graphing the complex number we see the angle terminates in the second quadrant. This means the argument, the angle, will be between 90 degrees and 180 degrees.
So if we create a right triangle with that point after graphing it. We see the height of that triangle is 5 because that is the imaginary part. The base of that triangle has length
. The problem is this doesn't give us any part of the angle we want, but it does give us the complementary of the part of the angle that is in second quadrant.
Let's find the complementary angle.
So the opposite side of the complementary angle is 5.
The adjacent side of the complementary angle is
.




So 90-30=60.
The answer therefore 60+90=150.