If 2 1/2 posterboard is enough for 1/2 of the project, it will take another 2 1/2 posterboard to display the other half of the project.
2 1/2 + 2 1/2 = 4 + 1/2 + 1/2 = 4 + 1 = 5
Answer: 5 posterboard.
Answer: 82
Step-by-step explanation:
We simply need to substitute the values for x and y into the equation
Both variables are already given to us, x=9, y=2
8(9)+2+4(2)
72+2+8
82
Given:
μ = $3.26 million, averaged salary
σ = $1.2 million, standard deviation
n = 100, sample size.
Let x = random test value
We want to determine P(x>4).
Calculate z-score.
z = (x - μ)/ (σ/√n) = (4 - 3.26)/(1.2/10) = 6.1667
From standard tables,
P(z<6.1667) = 1
The area under the distribution curve = 1.
Therefore
P(z>6.1667) = 1 - P(z<=6.1667) = 1 - 1 = 0
Answer: The probability is 0.
Answer:
2x + 4 = 10 = x =3
Step-by-step explanation:
09 - 31 = 0 (the variable x is not present in the given system)
0 +5=6 (the variable x is not present in the given system)
2x + 4 = 10 = x = 3
09-1=4 (the variable x is not present in the given system)
51 - 7 = 1 (the variable x is not present in the given system)
3x + 1 = 9 = x = 8/3
It depends on which triangle it actually is