Answer:
it would be 90 degrees clocwise
Using the normal distribution, it is found that 58.97% of students would be expected to score between 400 and 590.
<h3>Normal Probability Distribution</h3>
The z-score of a measure X of a normally distributed variable with mean and standard deviation is given by:
- The z-score measures how many standard deviations the measure is above or below the mean.
- Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
The mean and the standard deviation are given, respectively, by:
The proportion of students between 400 and 590 is the <u>p-value of Z when X = 590 subtracted by the p-value of Z when X = 400</u>, hence:
X = 590:
Z = 0.76
Z = 0.76 has a p-value of 0.7764.
X = 400:
Z = -0.89
Z = -0.89 has a p-value of 0.1867.
0.7764 - 0.1867 = 0.5897 = 58.97%.
58.97% of students would be expected to score between 400 and 590.
More can be learned about the normal distribution at brainly.com/question/27643290
#SPJ1
Answer:
Vascular tissue
Step-by-step explanation:
Answer:
En el departamento de ventas.
Explicación paso a paso:
Los datos generales complementarios se pueden obtener del departamento de ventas donde están presentes los datos sobre ventas y nos ayudan a calcular los ratios de actividad. El índice de actividad se puede calcular dividiendo las ventas de la empresa por sus activos totales. Este índice de actividad indica la eficiencia de una empresa mediante el uso de sus activos disponibles para producir ventas. El índice de actividad también se denomina "Índice de gestión de activos". Los datos de ventas son necesarios para el índice de actividad que puede estar disponible en el departamento de ventas.
9x - 37 = - 118
add 37 to both sides
9x - 37 + 37 = -118 + 37
simplify
9x = -81
divide both sides by 9
9x/9 = -81/9
simplify
x = - 9
answer
x = -9