Answer: D. Smaller measure of tolerable misstatement.
Explanation:
The sample size simply means the number of participants that are included in a study. They're the group of subjects which are picked and selected from the population and represents the general population for that study.
From the options given, it should be noted that a smaller measure of tolerable misstatement will lead to a larger sample size.
Technically you could live in a tree house if you wanted to.
Answer: 75,000 units
Explanation:
Come up with an expression to solve this.
Assume the budgeted production needed is P.
P needs 2 pounds of raw materials per unit so raw materials needed are 2P.
Beginning raw materials for February have to be 30% of the needs of February;
= 30% * 2P
= 0.6P
Ending raw materials for February have to be 30% of March needs so;
= 30% * 100,000 * 2 pounds
= 60,000 pounds
So;
Budgeted raw materials purchase for February = Raw materials needed + Ending raw materials - Beginning raw materials
165,000 = 2P + 60,000 - 0.6P
1.4P = 165,000 - 60,000
P = (165,000 - 60,000) / 1.4
= 75,000 units
Answer:
The supervisors represent the company on a day-to-day basis.
Explanation:
Craig said that the supervisors take employee relations as part of their jobs.
The option that buttresses this is that supervisors represent the company on a day-to-day basis. Meaning the supervisors as owners of the company, and as if they have a stake. Supervisors taking ownership presupposes they perform tasks like handling employee relations to ensure the business and the employee work harmoniously.
Answer:
Maintenance total cost: 325,000
Cost Allocated to Packagin from Maintenance 162,500
Explanation:
![\left[\begin{array}{ccccc}&Maintenance&Cafeteria&Assembly&Packaging\\Employees&4&&8&8\\Direct \: Cost&270,000&275,000&&\\Allocate C&55,000&-275,000&&\\Subtotal&325,000&&110,000&110,000\\Allocate M&-325,0004&-15,760&-162,500&-162,500\\Total&&&272,500&272,500\\\end{array}\right]](https://tex.z-dn.net/?f=%5Cleft%5B%5Cbegin%7Barray%7D%7Bccccc%7D%26Maintenance%26Cafeteria%26Assembly%26Packaging%5C%5CEmployees%264%26%268%268%5C%5CDirect%20%5C%3A%20Cost%26270%2C000%26275%2C000%26%26%5C%5CAllocate%20C%2655%2C000%26-275%2C000%26%26%5C%5CSubtotal%26325%2C000%26%26110%2C000%26110%2C000%5C%5CAllocate%20M%26-325%2C0004%26-15%2C760%26-162%2C500%26-162%2C500%5C%5CTotal%26%26%26272%2C500%26272%2C500%5C%5C%5Cend%7Barray%7D%5Cright%5D)
We will divide the cafeteria cost by the sum of employees of the department and maintenance.
4+8+8 = 20
275,000/20 = 13,750
Then we multiply this by each department employees and add them to their cost.
Maintenance total cost after adding cafeteria is 325,000
Then we do the same, we divide this amount for the emplyees of the processsing department:
8 + 8 = 16
325,000/16 =20,325.5
Then we multiply by 8 employees: 162,500
Maintenance total cost: 325,000
Cost Allocated to Packagin from Maintenance: 162,500