Answer:
T=16.3Miles
Step-by-step explanation:
Because it is a square all lengths must be the same. So 16.3x4=65.2
or 16.3+16.3+16.3+16.3=65.2
9514 1404 393
Answer:
Step-by-step explanation:
The cost of each plan (y) is the sum of the initial fee and the product of the mileage charge and the number of miles (x).
First Plan: y = 40 +0.13x
Second Plan: y = 53 +0.08x
__
We can find when the costs are the same by solving this system of equations. A way to do that is to subtract the second equation from the first:
(y) -(y) = (40 +0.13x) -(53 +0.08x)
0 = -13 +0.05x
Multiplying by 20 gives ...
0 = -260 +x
Adding 260, we have ...
x = 260
The plans cost the same for 260 miles of driving.
__
The cost of the plans for that distance is ...
y = 40 +0.13x = 40 +0.13(260) = 40 +33.80
y = 73.80
The cost when the two plans cost the same is $73.80.
The slope is 2-2/6-6 which is zero . So the slope is no slope
Answer:
8.6
Step-by-step explanation:
The square root of 74 is 8.602325, which rounded to the nearest tenth, is 8.6
Answer:
what are the coordinates
Step-by-step explanation: