Define rates at which the individuals paint.
Bill: x = 1/8 signs/h
Bob: y = (2 signs)/(8 h) = 1/4 signs/h
Barry: z = (4/3 signs)/(8 h) = 1/6 signs/h
The job is to paint 2 signs, working together.
In the first 3 hours, the amount painted is
(x+y+z signs/h)*(3 h) = (1/8 + 1/4 + 1/6)*3 = 13/8 signs
Remaining: 2 - 13/8 = 3/8 signs
Barry quits.
In the next 1/2 hour (30 minutes), the amount painted is
(x + y signs/h)*(0.5 h) = (1/8 + 1/4)*0.5 = 3/16 signs
Remaining: 3/8 - 3/16 = 3/16 signs
Now Bob quits.
The time for Bill to finish the job is
(3/16 signs)/(1/8 signs/h) = 3/2 h
Answer: Bill finishes the job in 1.5 hours (or 1 hour, 30 minutes)
Answer: its 22.57%
Step-by-step explanation:
I got it wrong on hegarty so I could show you the answer since your an army lol
Answer:
DIALATION- REDUCTION
Step-by-step explanation:
Answer:
4m
Step-by-step explanation:
We are looking for the circumference
We need to find the radius
r = d/2 = 1.2/2 = .6
C = 2*pi*r
C = 2*pi*(.6)
C = 1.2*pi
We can approximate pi by 3.14
C =1.2*3.14
C =3.768 m
To the nearest meter
C = 4m
It’s 21.9 hope this helps