1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Sloan [31]
3 years ago
14

5.125 divided by 7.1

Mathematics
2 answers:
Olegator [25]3 years ago
8 0

Answer:

0.72

Step-by-step explanation:

Mrac [35]3 years ago
5 0

Answer:0.72183098591

Step-by-step explanation:5.125 dovided by 7.1=0.72183098591

You might be interested in
Please help me with a) and b) I’m very lost, please explain and how you got your answer
Karo-lina-s [1.5K]

To solve A, complete the square for both variables.

The center is (6,4)

8 0
4 years ago
Allentown got 2 feet less than twice the amount of snow Georgetown got . Allentown got 3 feet more snow than Georgetown. How man
Mandarinka [93]


x=2y-2

x=y+3

Substitute the second equation into the first

y+3=2y-2

solve for y

y=5

plug into original

x=y+3=5+3=8 or x=2(5)-2=8

Allentown got 8 ft of snow, Georgetown got 5 ft of snow.

4 0
3 years ago
Read 2 more answers
1. The sum of a number and ten.
ale4655 [162]
Answer: X+10

X+10
Explanation:
Break down the information given to you to try and identify what the algebraic expression must looks like. You know that you're dealing with
a sum
→
this means that you are adding something, so you're going to use the
+
sign;

of a number
→
this means that you're dealing with a variable. The most common notation for a variable is
x
.

and 10
→
this is simply an integer that must appear in the algebraic expression along the variable
x
.

So, put all this together to get
x
+
10
You're adding an unknown number,
x
, to an integer,
10
3 0
3 years ago
Read 2 more answers
An architect is designing square windows with an area of(x2 + 16x +64) ft?. The dimensions of the
Darina [25.2K]

A) The dimensions are (x+10) by (x+10).

B) The perimeter is given by 4x+40.

C) The perimeter when x is 4 is 56.

The quadratic can be factored by finding factors of c, the constant, that sum to b, the coefficient of x.  Our c is 100 and our b is 20; we want factors of 100 that sum to 20.  10*10=100 and 10+10=20, so those are what we need.  This gives us (x+10)(x+10 for the factored form.  

Since the dimensions are all (x+10), and there are 4 sides, the perimeter is given by 4(x+10).  Using the distributive property we have 4*x+4*10=4x+40.

To find the perimeter when x=4, substitute 4 into our perimeter expression:

4*4+40=16+40=56.

6 0
2 years ago
Read 2 more answers
Ann has 30 jobs that she must do in sequence, with the times required to do each of these jobs being independent random variable
IgorLugansk [536]

Answer:

P(T_A < T_B) = P(T_A -T_B

Step-by-step explanation:

Assuming this problem: "Ann has 30 jobs that she must do in sequence, with the times required to do each of these jobs being independent random variables with mean 50 minutes and standard deviation 10 minutes. Bob has 30 jobs that he must do in sequence, with the times required to do each of these jobs being independent random variables with mean 52 minutes and standard deviation 15 minutes. Ann's and Bob's times are independent. Find the approximate probability that Ann finishes her jobs before Bob finishes his jobs".

Previous concepts

The central limit theorem states that "if we have a population with mean μ and standard deviation σ and take sufficiently large random samples from the population with replacement, then the distribution of the sample means will be approximately normally distributed. This will hold true regardless of whether the source population is normal or skewed, provided the sample size is sufficiently large".

Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".

Solution to the problem

For this case we can create some notation.

Let A the values for Ann we know that n1 = 30 jobs solved in sequence and we can assume that the random variable X_i the time in order to do the ith job for i=1,2,....,n_1. We will have the following parameters for A.

\mu_A = 50, \sigma_A =10

W can assume that B represent Bob we know that n2 = 30 jobs solved in sequence and we can assume that the random variable [tex[X_i[/tex] the time in order to do the ith job for i=1,2,....,n_2. We will have the following parameters for A

\mu_B = 52, \sigma_B =15

And we can find the distribution for the total, if we remember the definition of mean we have:

\bar X= \frac{\sum_{i=1}^n X_i}{n}

And T =n \bar X

And the E(T) = n \mu

Var(T) = n^2 \frac{\sigma^2}{n}=n\sigma^2

So then we have:

E(T_A)=30*50 =1500 , Var(T_A) = 30*10^2 =3000

E(T_B)=30*52 =1560 , Var(T_B) = 30 *15^2 =6750

Since we want this probability "Find the approximate probability that Ann finishes her jobs before Bob finishes his jobs" we can express like this:

P(T_A < T_B) = P(T_A -T_B

Since we have independence (condition given by the problem) we can find the parameters for the random variable T_A -T_B

E[T_A -T_B] = E(T_A) -E(T_B)=1500-1560=-60

Var[T_A -T_B]= Var(T_A)+Var(T_B) =3000+6750=9750

And now we can find the probability like this:

P(T_A < T_B) = P(T_A -T_B

P(\frac{(T_A -T_B)-(-60)}{\sqrt{9750}}< \frac{60}{\sqrt{9750}})

P(Z

7 0
3 years ago
Other questions:
  • If a house is 15 meters long and 12 meters wide how long is the diagonal of the house
    7·2 answers
  • Tom received a coupon in the mail for 30%off one regular priced item for a local sporting goods store He wishes tp purchase a so
    5·1 answer
  • 34 points will mark Brainylest
    15·2 answers
  • Which angles are shown in the diagram?
    14·2 answers
  • The Hamburger Joint lowered their prices and their sales increased from 1000 hamburgers a week to 2500 hamburgers a week. What i
    9·2 answers
  • Whats 10 2/5 as a improper fraction?
    8·2 answers
  • A coin is flipped 70 times and lands on tails 21 times. What is the relative frequency of the coin landing on tails?
    11·2 answers
  • Help me out please? Math photo
    5·1 answer
  • Mae ling earns a weekly salary of $325 plus a 6.5% Commission on sales at a gift shop. How much would she make in a work week if
    12·2 answers
  • (w- 4/9) (-2/3) = -4/5 <br><br> Solve for w
    9·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!