The coefficient C-term is 1 in problem. The coefficient is the number before the variable of said equation. Example, the coefficient of X for thus problem 4x-4y is 4 the number BEFORE the variable, never variable itself it won’t ever be 4x
Answer
The probability of rolling a number of 2 is 1/6 (16.667%)
The probability of rolling a number of 3 is 2/6 (33.33%)
The probability of rolling a number 4 is 3/6 (50%)
The probability of rolling a number 5 is 4/6 (66.667%)
Explanation:
I’m not sure what you were trying to look for. So I put the probability for numbers 2,3,4, and 5. Your welcome, have a great day/night!.
Answer:
the new perimeter will be 1/3 time the perimeter of the original rectangle
Step-by-step explanation:
Answer:

Step-by-step explanation:


Answer:
Actual height of the building is 670 m
Step-by-step explanation:
We have been the actual height of a Ferris wheel which is 134 m. Along with it we are also given the scaled down heights of a Ferris wheel and a building. Using this data we have to find the actual height of a building.
Actual height of Ferris wheel = 134 m.
Height of Ferris wheel using the scale = 0.65 cm
Height of building after using the scale - 3.25 cm
Let, the actual height of building be x meters.
Since, the same scale is being used, the ratio of actual heights to that of scaled down heights must be the same for both objects.
i.e.
Ratio of Actual Height to scale height of Ferris Wheel = Ratio of Actual Height to scale height of the building
Using the values, we get:

The units of actual heights are in meters, so this means the actual height of the building is 670 m