Looks like the labeled angle is bisected, in which case we can apply the angle bisector theorem. For this triangle, it says

Solve for
:




Then either
or
, but since
is a length, it must be positive. So <em>x</em> = 2.
P(X<=x) = 1 + 5.486 = 6.486
The z-score of the information given is,
z = (x - µ )/ σ
Where,
µ = mean
σ = standard deviation
From the information given,
x = 3.71
µ = 86
σ = √225 = 15
hence,
z = (3.71 - 86)/15 = -5.486
thus,
P(X<=x) = 1 + 5.486 = 6.486
hence , P(X<=x) = 1 + 5.486 = 6.486
Learn more about variance here brainly.com/question/9304306
#SPJ4
Answer:
0.51km × 1000 = 510m
510m × (3×7) = 510m × 21 = 10710m in whole
Step-by-step explanation:
first we transform km to m (multiply by 1000)
then we count how much days are in three weeks ( 3 weeks × 7 days)
then we just multiply the meters per day × the days
99% it's true
Answer:
196
Step-by-step explanation:
Answer:
Read step by step explanation
Step-by-step explanation:
The owner already knows that the limit for the average time delivered pizzas is 38 minutes. So we conclude
1.-The resulting mean from sample data ( x ) ( 27 customers) need to be smaller than 38 minutes, any value of sample above 38 minutes means more time for the delivery action and will indicate a failure for the future project
2.-As sample size is smaller than 30 the test has to be t-student one tail test to the left
Test hypothesis
Null hypothesis H₀ x = 38
Alternative hypothesis Hₐ x < 38
We should test at a significance level α = 0,05 (α = 5%)
If the result of the test is to accept H₀ delivery project won´t be implemented, if on the other hand, H₀ is rejected then in the condition of the alternative hypothesis we accept Hₐ the sample indicates that we have a smaller average time than 38 minutes.