1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
murzikaleks [220]
3 years ago
11

Which of the following is an example of an involuntary movement?

Social Studies
2 answers:
Wewaii [24]3 years ago
4 0
Where are the options?
Sladkaya [172]3 years ago
3 0
A. Your stomach rumbling
You might be interested in
Why would President George Washington warn the country to remain neutral, avoid debt, avoid sectionalism, and avoid political pa
valkas [14]

Because there were bigger, stronger, older nations that would
have loved to get their hands on that rich territory that the United
States covered ... France, England, Spain, etc.  Washington knew
that the young USA could only survive as a nation if the people
remained united, and all those things ... taking sides in international
conflict (not remaining neutral), national debt, sectionalism (north
against south, east against west, old states against new states),
political parties (Whigs against Tories, Republicans against
Democrats), are things that could set groups of the people
against each other.

8 0
2 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
During the colonial period, the ports of savannah and Brunswick supported England’s economic policy of... A. Mercantilism B. Com
jok3333 [9.3K]

The answer is A. Mercantilism

6 0
3 years ago
According to Mace and Belfior(1990), in using high-p request strategies, social praise may not increase compliance if motivation
Alexxandr [17]

Answer:

high quality stimuli

Explanation:

According to Mace and Belfior(1990) in their research study, titled Behavioral Momentum in the Treatment of Escape-Motivated Stereotypy, it was concluded and recommended that, instead of using high-p request strategies, a high value reinforcer should be used to increase compliance if motivation for escape behavior is high. This high value reinforcer is referred to as HIGH QUALITY STIMULI in the research study.

5 0
3 years ago
The text describes Romanian orphanages in the early 1990s in which all of the infants had been seriously deprived of nutrition,
galben [10]

Answer:

4) They had a rate of cognitive impairment several times higher than the children adopted at less than 6 months of age.

Explanation:

This experiment shows how important the first months of development are in childhood. The effects of deprived nutrion, afection, and cognitve stimulation can cause serious damages. When adopting, all these conditions can improve, so the earlier a child is adopted, the best it would do to their development.

Cognitive development depends very much on emotional facts as well as on nutrional facts. A child needs the most optimal conditions to fully developed, and the earlier that is corrected, the ealier it can improve.

4 0
3 years ago
Other questions:
  • How did new farming methods contribute to the growth of medieval European towns?
    15·1 answer
  • Which of these is an example of a plateau period
    12·1 answer
  • The national response framework is a comprehensive guide to prevention. True or False
    13·1 answer
  • Brad is a first grade teacher who is teaching his students various colors. Most of the students are participating in the lesson
    10·1 answer
  • All of the following are examples of how people adapt to their environment, except __________. PZZ HELP ME
    9·2 answers
  • Of the following sources, where might you expect to find biased information?
    11·2 answers
  • Select all that apply.
    7·1 answer
  • Phân tích yếu tố ảnh hưởng trực tiếp đến cơ sở tự nhiên và xã hội của lý ngừơi
    9·1 answer
  • Use the Comparing Interest Groups and Political Parties Venn diagram and compare and contrast facts about the two types of group
    8·1 answer
  • The original goals of a social movement are sometimes swept aside during the a. Bureaucratization stage. C. Institutionalization
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!