Answer:
15 + 2 = 17
Step-by-step explanation:
Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Answer:
Cos;
26 degrees
Step-by-step explanation:
Recall: SOH CAH TOA
Reference angle = y°
Adjacent side = 18 in.
Hypotenuse = 20 in.
We would apply the trigonometric function CAH since we are dealing with the Adjacent side (A) and the Hypotenuse (H). Thus:
Cos y° = Adj/Hyp
Cos y° = 18/20
Cos y° = 0.9
y° = cos^{-1}(0.9)
y = 25.8419328° ≈ 26 degrees (nearest whole degree)
The answers are:
Cos and 26 degrees
Answer:
.
Step-by-step explanation:
We have been given that 4 days I have 140 copies of a book, 9 days I only have 50 left. We are asked to write an equation , where c is number of copies still on hand and t days being available.
We have two points on line (4,140) and (9,50). Now, we will use these points to find slope as:
Now, we will use point-slope form of equation and substitute and coordinates of point (9,50) as:
Therefore, our required equation would be .