Answer
NO sorry
Have a great day
Answer:
The best reading techniques are the SQ3R technique, skimming, scanning, active reading, detailed reading, and structure-proposition-evaluation.
Explanation:
The correct option is A.
When using crane at a construction site, it is required that:
1.A poster should be posted at the job site with an illustration of the hand signals that every operator and personnel working with the crane and around the crane must know.
2. Hand signals for crane and derrick operators should be those set by the American National Standard institute customize for the type of crane in use.<span />