1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
salantis [7]
3 years ago
5

5. How should you use Linkedln Answers as a professional?

Computers and Technology
1 answer:
viva [34]3 years ago
6 0
Oh okie oh gosh lol lol lol lol yeah
You might be interested in
Email is the most common function used in Outlook. Use the drop-down menus to complete the following sentences. By default, the
Olegator [25]
1. Inbox 2. Drafts 3. in the bold font 4. Reading. Hope this helps!
3 0
3 years ago
Read 2 more answers
An over-target baseline (OTB) is a comprehensive rebaselining effort that is best categorized as an internal replanning effort.
masha68 [24]

Answer:

The answer is "option B".

Explanation:

An OTB stands for an over-target baseline, it is a new management benchmark when an original target can't have coincided and new goals for management purposes are required.

  • It is also known as a reference to the foundation for calculating or constructing.
  • It is an understanding between the client and the contractor that the cost base, which is not part of the original contract budget, should include an extra budget

6 0
4 years ago
Consider the following code segment, where num is a properly declared and initialized integer variable. The following code segme
seropon [69]

Answer:

10 or 22 or 15 or 40

Explanation:

In the second for loop[for (int k = 1; k < arr[0].length; k++)], k starts from 1 instead of zero. That means that it doesn't read the first value of every row when finding num.

So if num was any of the above values, the program wouldn't work. I had the same question, and the answer for mine was 15.

3 0
3 years ago
_____ serves as a foundation for comparison or measurement.
sammy [17]

Answer: C

Explanation: Baseline is the starting point or used for comparison or measurement.

6 0
3 years ago
Based on the current economic situation do you expect the employment demand for graduating engineers to increase or decrease? Ex
Delicious77 [7]

Answer: the employment demand would increase.

Explanation:

Several factors affect the employment demand especially in a field as peculiar as engineering, the cumulative build up of unemployed graduates and the skill set required to fit into the present working structure is also of Paramount importance. The evaluation method for recruitment seeks to function based on this rationale by selecting a few amongst many.

8 0
3 years ago
Other questions:
  • What will be the output of “AAAAMMMMMHHHVV” using a file compression technique?
    9·2 answers
  • Which of the following rules should be used to keep the appropriate distance between your vehicle and the vehicle in front of yo
    10·2 answers
  • 2) Describe how data becomes knowledge.​
    10·1 answer
  • Conduct research to determine the best network design to ensure security of internal access while retaining public website avail
    9·1 answer
  • Compute the approximate acceleration of gravity for an object above the earth's surface, assigning accel_gravity with the result
    14·1 answer
  • Why should running your unit test suites not take a long time?A. Unit tests aren't that important, so less time should be spent
    5·1 answer
  • Write a java program to read elements in an array from user and count total number of duplicate elements in array.
    12·1 answer
  • What is phishing?
    14·1 answer
  • What changes the size of a video when played?
    10·2 answers
  • Select the three subjects studied in sports biomechanics.
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!