A is the right answer 3+5 is 8 plus 2 is 10. 2+3 is 5 plus 5 is 10
Hi there
I=prt
P principle 8000
R interest rate 0.095
T time 120/360
I interest earned?
I=8,000×0.095×(120÷360)
I=253.33
Hope it helps
10! This is the correct answer for apex
Answer: (13.4996, 32.5004)
Step-by-step explanation:
The confidence interval for mean difference is given by :-
,
where
= sample mean difference .
= critical t value (two-tailed)
SE= Standard error.
Given :

SE= 4.2
Now, the confidence interval for mean difference will be :-
Hence, the required confidence interval : (13.4996, 32.5004)
14. You divide the length of ribbon by the size of the pieces wanted so you get
49/3.5 = 14