Answer:
the answer of 3 is probably (c)
Answer:95
Step-by-step explanation:2x19=38
5x19=95
The cost of hiring a car for 2 days in 2013 is Rs. 316.8
<h3>How to find the cost of hiring in 2013 ?</h3>
The cost for hiring a car for 2 days in 2018 was Rs. 264 which was 20% more than in 2013.
Therefore,
cost of hiring for 2018 = Rs. 264
Therefore,
let
cost of hiring in 2013 = 20%(264) + 264
cost of hiring in 2013 = 20 / 100 × 264 + 264
cost of hiring in 2013 = 1 / 5 × 264 + 264
cost of hiring in 2013 = 264 / 5 + 264
cost of hiring in 2013 = 52.8 + 264
cost of hiring in 2013 = 316.8
Therefore, the cost of hiring a car for 2 days in 2013 is Rs. 316.8.
learn more on cost here: brainly.com/question/1663590
#SPJ1
Step-by-step explanation:
Y=2/3x-4 is in Slope - intercept form meaning you are shown the slope (how steep the line is) and the y intercept (where the equation hits the vertical axis)
With the given information, select the point (0, -4) on the graph, this is where the line crosses the y axis, as shown through the -4 in the equation.
Next, look at the slope and youll see 2/3x. Slope is in format "rise over run" meaning the first number (2) is the vertical change, so up two, and the second number (3) is horizontal change, right 3.
Combine these two steps together and select point (0. -4) then the next point should be at (3,2), 2 units up and three to the right from the y intercept.