Let X be the cycle time for trucks hauling concrete to a highway construction site
Given that X is U(50,70)
Hence pdf of X is

Let A be the event that cycle time is no more than 65 minutes and
B the event cycle time exceeds 55 minutes
Required probability
= the conditional probability that the cycle time is no more than 65 minutes if it is known that the cycle time exceeds 55 minutes
= P(A/B)
=
Answer:
Option 3)............... I guess so
Answer:
Exact Form:
x
=
−
3/
2
Decimal Form:
x
=
−
1.5
Mixed Number Form:
x
=
−
1 1/
2
Step-by-step explanation:
Answer: D
Step-by-step explanation:
The given functions are
Now these are exponential curves and the bases for the functions are 3.5 & 1.5
Also the graph of g(x) is between f(x) & h(x)
Hence the value of base called the scale factor must be between 3.5 & 1.5.
4 & 5 are more than 3.5
0.9 is smaller than 1.5
But π = 3.14 lies between 3.5 & 1.5.
Hence the only option which can represent the graph of g(x) is
Option D) is the right answer