there are 3600 seconds per hour
5280 feet per mile
1 foot per second = 3600/5280 = 0.681818 Miles per Hour
60 seconds per minute
so 1500/60 = 25 feet per second
25 x 0.681818 = 17.05 miles per hour
Answer:
An arrow diagram
Step-by-step explanation:
Helps keep track of intricate relationships between variables. Specifies the phenomena of interest: independent, alternative, antecedent and intervening.
-Time on the bottom with an arrow
-Antecedent -> Independent -> intervening-> dependent
An arrow diagram is defined as a process diagramming tool used to determine optimal sequence of events, and their inter-connectivity. It is a network diagramming technique in which activities are represented by arrow, used for scheduling and to determine the critical path through nodes. The arrow diagramming method shows the required order of tasks in a project or process, the best schedule for the entire project, and potential scheduling and resource problems and their solutions. The arrow diagram lets you calculate the "critical path" of the project the flow of critical steps where delays can affect the timing of the entire project and where addition of resources can speed up the project.
One headed arrow connecting two variables= "X directly causes Y"
I think your equation is wrong. the domain of f(x)= 5x+2 is ALL REAL NUMBERS. That means it’s negative infinity to positive infinity.
Answer:
The ordered pair generated from the equation is (1, 6).
Step-by-step explanation:
An ordered pair is a pair of numbers, representing two variables, in a specific order. For instance, (<em>x</em>, <em>y</em>) = (1, 2) here <em>x</em> = 1 and <em>y</em> = 2.
The equation provided is:

Check for all the options:
- A (1, 6):
- B (1, 2):
- C (3, 6):
- D (8, 16):
Thus, the ordered pair generated from the equation is (1, 6).
Answer:
Part A = $180
Part B = $104
Step-by-step explanation:
Part A:
You do 255÷5=51
51 x 4 = 180
Part B:
You do 130÷5=26
26 x 4 = 104