Answer:
7.5kg
Step-by-step explanation:
Given that:
Monday:
Mass of sand = 24 kg
Mass of cement = 5 kg
Tuesday :
Mass of sand = 36 kg
Let mass of cement = c
Mass of cement required to make the same type of mortar mix
Mass of Sand = mass of cement
24kg = 5kg
36kg = c
By cross multiplication :
24 * c = 5 * 36
24c = 180
Divide both sides by 24
c = 180 / 24
c = 7.5 kg
Hence mass of cement required is 7.5 kg
Heres an equation: 126/3 = 42
Answer:
210 cm³
Step-by-step explanation:
RULE :
the volume of the triangular prism = the area of the base × the height
= 14 × 15
= 210
The equation of the line which is plotted on the graph and passes from the points (2,5) and (-2,-3) is y=2x-6.
<h3>What is the equation of line?</h3>
The equation of the line is the way of representation of a line in the equation form.
The equitation of the lines represents the line by the set of points on which the line lies or passes through in the coordinate system.
The formula to find equation of line is,
(y-y₁)={(y₂-y₁)/(x₂-x₁)}(x-x₁)
Here, x and y are the coordinate and subscript (1,2) used for the first and second point.
The points from which the line passes through are (2,5) and (-2,-3). Put the values,
(y-y₁)={(y₂-y₁)/(x₂-x₁)}(x-x₁)
(y-(-2))={(-3-5)/(-2-2)}(x-2)
y+2={-8/-4}(x-2)
y+2=2(x-2)
y+2=2x-4
y=2x-4-2
y=2x-6
Thus, the equation of the line which is plotted on the graph and passes from the points (2,5) and (-2,-3) is y=2x-6.
Learn more about the equation of line here;
brainly.com/question/13763238
#SPJ1