200 m to 4 hours
200/4
50m/1hour
Answer:
Only the given table represents a function. Option 1 is correct.
Step-by-step explanation:
A relation is called a function, if there exist a unique value of y for each value of x. It means for each input there exist a unique output.
A function is always a relation but all relations are not function.
In the given table for each value of x, we have unique value of y, therefore the given table represents a function.
In second relation, at x=-2, the values of y are y=10 and y=-7. For single x, there are more than one value of y, therefore the second relation is not a function.
In third relation, at x=6, the values of y are y=-2 and y=1. For single x, there are more than one value of y, therefore the third relation is not a function.
Answer:
The values of x and y are x = 6 and y = 9Step-by-step explanation:
MNOP is a parallelogram its diagonal MO and PN intersected at point A
In any parallelogram diagonals:
Bisect each other
Meet each other at their mid-point
In parallelogram MNOP
∵ MO and NP are its diagonal
∵ MO intersect NP at point A
- Point A is the mid-point pf them
∴ MO and NP bisect each other
∴ MA = AO
∴ PA = AN
∵ MA = x + 5
∵ AO = y + 2
- Equate them
∴ x + 5 = y + 2 ⇒ (1)
∵ PA = 3x
∵ AN = 2y
- Equate them
∴ 2y = 3x
- Divide both sides by 2
∴ y = 1.5x ⇒ (2)
Now we have a system of equations to solve it
Substitute y in equation (1) by equation (2)
∴ x + 5 = 1.5x + 2
- Subtract 1.5x from both sides
∴ - 0.5x + 5 = 2
- Subtract 5 from both sides
∴ - 0.5x = -3
- Divide both sides by - 0.5
∴ x = 6
- Substitute the value of x in equation (2) to find y
∵ y = 1.5(6)
∴ y = 9
The values of x and y are x = 6 and y = 9
Answer:
20 X 6
Step-by-step explanation:
20 X 6 = 120 I'm not smart but this is pretty easy
Operating Cycle is the average period of time for a business to make an initial outlay of cash to produce goods, sell the goods, and receive cash from cutovers in exchange for goods.