The value of
is 2500, when
and
.
Given that,
and
.
We need to find the value of
.
<h3>What is an
arithmetic sequence?</h3>
An arithmetic progression or arithmetic sequence is a sequence of numbers such that the difference between the consecutive terms is constant.
Now, to find the value of
:




Therefore, the value of
is 2500.
To learn more about arithmetic sequence visit:
brainly.com/question/15412619.
#SPJ1
Answer:
80 inches
Step-by-step explanation:
6 x 12 = 72 + 8= 80
Give brainliest please
Answer:
3.1
4.2
5.2
42
Step-by-step explanation: They’re congruent so just copy what the other triangle has all you had to do was find the radius.
Answer:
The percentle for Abby's score was the 89.62nd percentile.
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation(which is the square root of the variance)
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
Abby's mom score:
93rd percentile in the math SAT exam. In 1982 the mean score was 503 and the variance of the scores was 9604.
93rd percentile. X when Z has a pvalue of 0.93. So X when Z = 1.476.

So




Abby's score
She scored 648.

So



has a pvalue of 0.8962.
The percentle for Abby's score was the 89.62nd percentile.
Answer:
1
Step-by-step explanation:
point slope formula: y-y1=m(x-x1)
y-(3)=
(x-(8))
y-3=
x-2
y=
x+1