X^3 + 7*x^2 + -16*x-112
=(x + 4)*(x + 7)*(x - 4)
Answer:
The steps are numbered below
Step-by-step explanation:
To solve a maximum/minimum problem, the steps are as follows.
1. Make a drawing.
2. Assign variables to quantities that change.
3. Identify and write down a formula for the quantity that is being optimized.
4. Identify the endpoints, that is, the domain of the function being optimized.
5. Identify the constraint equation.
6. Use the constraint equation to write a new formula for the quantity being optimized that is a function of one variable.
7. Find the derivative and then the critical points of the function being optimized.
8. Evaluate the y-values of the critical points and endpoints by plugging them into the function being optimized. The largest y- value is the global maximum, and the smallest y-value is the global minimum.
Answer:
Step-by-step explanation:
A=1/10, b=1/12, c=1/15 (these are the rates for each worker...)
1.)
2(1/10)+4(1/12)+t/15=1
1/5+1/3+t/15=1
(3+5+t)/15=1
3+5+t=15
8+t=15
t=7
So it would take c 7 hours to finish the job.
2.)
1/40-1/60
(3-2)/120
1/120
The drain rate is 1/60. So you will need to find t when the tank is empty, while starting at 2/3 capacity...
2/3-t/60=0
(40-t)/60=0
40-t=0
t=40
It would take 40 minutes to empty the tank when it is 2/3 full.
Answer:
A
Step-by-step explanation:
We know million has 6 zeros.
So, 1 million would be written as:
1,000,000
Similarly, 27 million would be written as:
27,000,000
We know writing a number in scientific notation would make this a decimal in 1 decimal place, so we would select "2.7" as the base of the scientific number.
Now, how many places to the right do we need to go (in 2.7) to make it 27,000,000?
Counting, we see: 7 places
So, power of 10 would be "7", thus we can write:

Answer choice A is right