Answer: 12 hours
Step-by-step explanation:
Let x = time it takes to fill the pool if the inlet pipe and drain pipe are both open
1/6 = portion of pool filled per hour by the inlet pipe
1/12 = portion of pool emptied per hour by the drain
1/x = portion of pool filled per hour if the inlet pipe and drain are both open
Then, 1/6 - 1/12 = 1/x
Multiply by the LCD, 12x, to obtain
2x - x = 12
x = 12 hours
The class is weighted as follows:
60% Regular Tests
10% Final Exam
15% Project
15% Homework
The total weighted points possible for the class are as follows:
(100+100+100+100+100)*.6 + 100*.1 + 100*.15 + 100*.15 = 340
To calculate her individual final weighted grade we plug in her scores for each category and complete the following computation:
(92+83+77+84+82)*.6 + 88*.1 + 95*.15 + 77*.15 = 285.4
So her weighted grade percent would be 285.4/340 = 83.9% which is a B.
It will take 4.75 days, or 4 and 3/4's of a day if that's what you're looking for
Step-by-step explanation:
1. 
multiply

do both the numerator and denominater

200 divided by 8=25
25 x 3 <span>=75g</span>