2860 times .12 equals $343.20
Answer:
-See below
Step-by.step explanation:
In the first column, on the left of the vertical line, you place the first digit of the number , then on the second row on you place the second digit.
So on the second row you have the entries:
1 | 2 2 4 representing 12, 12 and 14.
On the first row the 2 0ne digit numbers 3 and 8 are represented by
0 | 3 8.
Similarly the last 2 rows are:
2 | 0 1 3 6
3 | 4
If you multiply 36 by four since there are 4 wheels for skateboard
you will get 144. That number is the total number of wheels you need to order and since they come in packs of 20 what you need to do is divide 144 by 20 and you will get 7.2. So obviously you can't order 7.20 packs of wheels so this means that 8 packs of wheels must be bought in order to ensure that all of the skateboards get wheels on them.
The answer is 8.
Answer:
166.666667 m/ps
Step-by-step explanation:
600/60 will give us the amount of kilometers in a minute. 10 km/ph, now i'll divide more to find the seconds. 0.166666667 this is the amount of KILOMETERS in a second, we are trying to find in meters. multiply by 1000 and 166.666667. a fast fricking train if you ask me.
We can write two equations for this. x = each minute of calls
Plan A = .1x + 16
Plan B = .14x
Make the two equations equal each other, so we can find when they are the same.
.1x + 16 = .14x
Subtract .1x from both sides
16 = 0.04x
Divide by 0.04 to get x by itself
400 = x.
Earlier, we set x as each minute of calls. This means that after 400 calls, Plan A and Plan B will cost the same.
To find the cost, substitute 400 into both equations by themselves.
Plan A cost = .1x + 16
Plan A cost = .1(400) + 16
Plan A cost = 40 + 16
Plan A cost = $56
Plan B cost = .14x
Plan B cost = .14(400)
Plan B cost = $56
Final answer: After 400 calls, Plan A and Plan B will both cost $56.