I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"
Answer and Explanation:
There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week
To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.
49 weeks×5 shifts= 245 shifts per operator per year
365×3 shifts= 1095 shifts per year
1095/245=4.5 operators per shift
total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14
total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928
Answer:
x=10
y=-2
(10,-2)
Step-by-step explanation:
If X=10, we can put 10 in for x in the equation.
30 + 5y = 20
Next, we need to solve to find y.
We will get y on its own so we subtract 30 from 20 to get
5y=-10
We then know that 5 goes into -10 -2 times.
y=-2
Answer:
A
Step-by-step explanation:
Since we're dealing with perpendicular lines, we take the recipricol of the m value of the original equation.
So the slope we're dealing with is 1/2.
And the equation we have so far is
y = 1/2x + b
Now we solve for b by plugging in the point (4,2).
2 = 1/2(4) + b
2 = 2 + b
b = 0
So the final equation is
y = 1/2x
37.6*9.25=$<span>347.8 without deductions</span>
Answer:
It's 1/3
Step-by-step explanation:
2/6 is equivalent to 1/3, so you can rewrite the question as 2/3 - 1/3.