It is good equation. Look, that:
81 = 3 x 3 x 3 x 3 = 3^4.
So you have to solve:
3^x = 3^4
exponents have to be the same, so
x=4
That's mean that A(4) = 81
Answer:
It will take 3.214 minutes.
Step-by-step explanation:
<em>It is given that, the conveyor belt transports 300 cans in 5 mins and the smaller belt transports 300 cans in 9 minutes.</em>
Thus , the speed of conveyor belt is,
= 
and of smaller belt is,
= 
Thus, when both are used together,
<em>conveyor belt will transport (60)(t) cans and smaller belt will transport
(t) cans per minute.</em>
Thus the equation becomes,

t = 
Answer: (60.858, 69.142)
Step-by-step explanation:
The formula to find the confidence interval for mean :
, where
is the sample mean ,
is the population standard deviation , n is the sample size and
is the two-tailed test value for z.
Let x represents the time taken to mail products for all orders received at the office of this company.
As per given , we have
Confidence level : 95%
n= 62
sample mean :
hours
Population standard deviation :
hours
z-value for 93% confidence interval:
[using z-value table]
Now, 93% confidence the mean time taken to mail products for all orders received at the office of this company :-

Thus , 93% confidence the mean time taken to mail products for all orders received at the office of this company : (60.858, 69.142)
Answer:
1..25a
Step-by-step explanation:
a + 25%·a = a(1 + 0.25) = 1.25a
_____
<em>Comment on percentages</em>
The symbol "%" is a shorthand way to write "/100", so 25% = 25/100 = 0.25.
Of course, 100/100 = 100% = 1.
Adding 25% of something to 100% of it gives 125% of it, the original amount multiplied by 125/100 = 1.25.