<h3>
Answer: (m+n)/(mn)</h3>
Work Shown:
Josh:
1 room = m hours
1/m room = 1 hour
Kevin:
1 room = n hours
1/n room = 1 hour
We see that the rates for Josh and Kevin are 1/m and 1/n respectively. This is the amount of a room they paint in one hour. Combine the fractions
1/m + 1/n = n/(mn) + m/(mn) = (n+m)/(mn) = (m+n)/(mn)
The expression (m+n)/(mn) represents how much of the room they get painted in 1 hour. This is if they work together and it assumes neither worker slows the other one down.
95 is the better deal it’s only 35 more bucks and you get 150 more.
Given:
Entrance fee per student: $5(29)
Lunch costs: $4(29 + 6)
Bus fees: $25 + 8($2 + $3)
Total cost: 5(29) + 4(35) + 25 + 8(5)
To find:
The equivalent expressions of the total cost that use the properties of operations to simplify the math.
Solution:
We have,
Total cost = 5(29) + 4(35) + 25 + 8(5)
To simply this expression, we need to write 29 and 35 in the expand form or as the sum of their place values because it is easy to multiply a number with multiply of 10 and single digit.
Total cost = 5(20+9) + 4(30+5) + 25 + 40
Therefore, the correct option is B.
Answer:
720ft²
Step-by-step explanation:
Wall 1&2 = lh = 15*10=150
Wall 3&4 = wh = 12*10=120
Ceiling = lw = 12*15=180
120+150+120+150+180=720ft²