Answer:
Sharika needs 2.5 days to finish the remaining work
Step-by-step explanation:
Sharika can do a work in 6 days palkey can do it in 8 days
Then the amount of work sharika can do in 1 day = 1/6
And the amount of work palkey can do in 1 day = 1/8
The amount of work both of them can do together in 1 day = 1/6 + 1/8
= 7/24
The amount of work both of them can do together in 2 day = (2× 7/24)
= 7/12
Since Palkey left the work,the amount of
work remaining for Sharika to do alone = (1 - 7/12 )
= 5/12
The number of days Sharika take to finish the remainig work. = (5/12 ÷ 1/6 )
= 5/2 days
Therefore, Sharika needs 2.5 days to finish the remaining work.
Answer:
The answer is below
Step-by-step explanation:
A linear function graph can be represented by:
y = mx + b; where m is the slope and b is the y intercept, x is the independent variable and y is the dependent variable.
a) From the graph we can see the graph passes through the point (0, 100) and (20, 400). Hence we can use the following formula to find the equation:

b) An example of real life linear function is the energy consumed per day in kWh. Let us assume 5 kWh is consumed each day by the person. Since the independent variable is the days, it would be on the x axis, while the dependent variable (energy consumed) would be on the y axis.
Answer:
Explanation: Irrational numbers are non-terminating, recurring decimal numbers i.e, a decimal expansion that neither terminates nor becomes periodic which cannot be expressed in the form of a fraction. ... Integer is a complete entity that includes every natural number along with its negatives and zero.
Step-by-step explanation:
Answer:
The equation of the line that passes through the points
(1,-6) and (-4,9)
is
y=-3x-3
Suplementary is angles add up to 180 degrees
C=180-D
C=180-84
C=96 degrees
Hope this helped :)