Answer:
a.) Between 0.5 and 3 seconds.
Step-by-step explanation:
So I just went ahead and graphed this quadratic on Desmos so you could have an idea of what this looks like. A negative quadratic, and we're trying to find when the graph's y-values are greater than 26.
If you look at the graph, you can easily see that the quadratic crosses y = 26 at x-values 0.5 and 3. And, you can see that the quadratic's graph is actually above y = 26 between these two values, 0.5 and 3.
Because we know that the quadratic's graph models the projectile's motion, we can conclude that the projectile will also be above 26 feet between 0.5 and 3 seconds.
So, the answer is a.) between 0.5 and 3 seconds.
Answer:
D
Step-by-step explanation:
Answer:
$468.09
Step-by-step explanation:
first we must calculate the expected future value of the engine overhaul:
($390 x 10%) + ($570 x 30%) + ($750 x 50%) + ($790 x 10%) = $39 + $171 + $375 + $79 = $664
now we must determine the present value of $664 using a 6% interest rate:
PV = FV / (1 + r)⁶ = $664 / 1.06⁶ = $468.09
It is around 400, if u see the world “of” is usually means multiply :)
Answer:
a) How many minutes does it take to make one balloon sculpture?
= 4 minutes
b) How many balloons are used in one sculpture?
= 6 balloons
Step-by-step explanation:
In 88 minutes, he uses 132 balloons to make 22 identical balloon sculptures.
a) How many minutes does it take to make one balloon sculpture?
22 identical balloon sculptures = 88 minutes
1 balloon sculpture = x
x = 88 minutes/22
x = 4 minutes
b) How many balloons are used in one sculpture?
22 balloon sculptures = 132 balloons
1 balloon sculpture = x
Cross Multiply =
22x = 132 balloons
x = 132 balloons/22
x = 6 balloons