*
Answer:
The correct answer is A.
Explanation:
I put D from the answer above and got it wrong and it said A was the correct answer. haha :)
Answer:
Having the integrated peripherals in the same locations as the old system board
Explanation:
System board is the printed circuit board that is used to connect the peripheral devices. It provides the slots and ports to connect the peripherals devices.
If there is a need to replace the system board of the laptop. You can change the system board. On new system board, all the peripherals that are installed on previous (old) system board should be placed on new system board. As the system requirements are same, only printed circuit board of the system is changed.
The new system board is replica of the previous board so, we can not change peripheral of the system boards.
Answer:
Cell.
Explanation:
Electromagnetic waves is a propagating medium used in all communications device to transmit data (messages) from the device of the sender to the device of the receiver.
Generally, the most commonly used electromagnetic wave technology in telecommunications is radio waves.
Radio waves can be defined as an electromagnetic wave that has its frequency ranging from 30 GHz to 300 GHz and its wavelength between 1mm and 3000m. Therefore, radio waves are a series of repetitive valleys and peaks that are typically characterized of having the longest wavelength in the electromagnetic spectrum.
Basically, as a result of radio waves having long wavelengths, they are mainly used in long-distance communications such as the carriage and transmission of data.
In the field of telecommunication, all telecommunication setup are designed and developed to make use of two network devices: one device is typically used for the transmission of data while the other device is used to receive data that are sent on the network.
Generally, cell towers are tall poles that are used to transmit frequencies to mobile phones.
Answer:
Most likely C
Explanation:
Blueprint is the plan so she makes it 1st.
Building the roof is after the deck.
The deck is after the blueprint.
After it's all done she looks at it and thinks about what went wrong at then end.
If there are no mistakes it's B.
Hope this answers your question :).