1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Orlov [11]
3 years ago
14

Select the best answer for the question.

Mathematics
2 answers:
fgiga [73]3 years ago
7 0
The answer is D - 4/5
Sever21 [200]3 years ago
3 0
The answer is A) 3/5
You might be interested in
Which of the following equations was used to graph the line shown?
Sunny_sXe [5.5K]

Answer:

a

Step-by-step explanation:

its obvious

5 0
3 years ago
Read 2 more answers
Can someone explain?
Lady_Fox [76]

Answer:

translation, because you are moving it. rotation is when you are modifying the degrees. translation is moving it where ever on the x or y axis.

if you want me to break it down even further with non confusing math words, just let me know !

Step-by-step explanation:


8 0
3 years ago
Which function has the higher rate of change over the interval [0,3]
Oksana_A [137]
Since the average rate of change of a function is the slope of the associated line we have already done the work in the last problem. That is, the average rate of change of from 3 to 0 is 1. That is, over the interval [0,3], for every 1 unit change in x, there is a 1 unit change in the value of the function.
7 0
3 years ago
How would u do this w/o plugging in the numbers?
nordsb [41]
First isolate y for each equation so that y = x^2 + 3 and y = 2x^2 + 2 now set those equal to eachother and solve for x, 

x^2 + 3 = 2x^2 + 2
= √x^2 = <span>√1
x is +- 1

then plug in x for one of the original equations y = 1^2 + 3 = 4

x = +-1
y = 4</span>
3 0
3 years ago
Theodore recently hired a contractor to do some necessary work. On the final bill, Theodore was charged a total of $715. $315 wa
dem82 [27]

Answer:

Hours of labor needed  = 8 hour

Step-by-step explanation:

Given:

Amount total charged = $715

Listed amount = $315

Hourly rate for labor = $50

Find:

Hours of labor needed

Computation:

Total amount of labour = Amount total charged - Listed amount

Total amount of labour = 715 - 315

Total amount of labour = $400

Hours of labor needed  = Total amount of labour / Hourly rate for labor

Hours of labor needed  = 400 / 50

Hours of labor needed  = 8 hour

4 0
3 years ago
Other questions:
  • What is the LCM of 14 and 35?<br> a. 140<br> b. 70<br> c. 56<br> d. 7
    8·2 answers
  • What is 1000000000000000003938033038393893383938934839399203848439292893839383399392377484393929384484739392028384484 times 8387
    7·1 answer
  • (1 ÷ x- 1)+(2÷ x+2)=(3÷2) solve and check for extraneous solutions
    6·1 answer
  • What is the difference of 3ab and 7bc
    7·2 answers
  • Select the correct product.
    12·1 answer
  • Find all the real fourth roots of 2401
    9·1 answer
  • What is the value of the 6 in the number 1,265,432
    10·2 answers
  • Find the difference.<br><br> 678-595.8
    11·2 answers
  • The rod is made of A-36 steel and has a diameter of 0.22 in . If the rod is 4 ft long when the springs are compressed 0.7 in . a
    12·1 answer
  • Find slope and intercept of the line 3x - 2y - 7 = 0
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!