1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
BlackZzzverrR [31]
3 years ago
5

In order to complete a large job, 1000 workers were hired, just enough to complete the job on schedule. All the workers stayed o

n the job while the first quarter of the work was done, so the first quarter of the work was completed on schedule. Then 100 workers were laid off, so the second quarter of the work was completed behind schedule. Then an additional 100 workers were laid off, so the third quarter of the work was completed still further behind schedule. Given that all workers work at the same rate, what is the minimum number of additional workers, beyond the 800 workers still on the job at the end of the third quarter, that must be hired after three-quarters of the work has been completed so that the entire project can be completed on schedule or before?
Mathematics
2 answers:
dexar [7]3 years ago
7 0

Answer:

766

Step-by-step explanation:

it was on rsm

slamgirl [31]3 years ago
3 0

This is just here for the 20 character limit but the answer is in the picture.

You might be interested in
What is the geometric mean of 3 and 15
Helen [10]
Trick question. There is not one. Due to the fact that 3 is a factor of 15 and if you factor it you will get five which is a third of 15. 
4 0
3 years ago
The product of a number X and six is for more than the product of the number and 3/8. Which answer represents this situation?
stiks02 [169]

Answer:3/8y+(6x+4)

Step-by-step explanation:

I’m 99% sure to is is right

6 0
3 years ago
The populations of Cities A and B are 1.6 x 10^5 and 1,070,000​, respectively. The population of City C is twice the population
Semenov [28]

Answer:

13.375 times

Step-by-step explanation:

1,070,000 times 2=2,140,000. 2,140,000 divided by 160,000=13.375.

3 0
3 years ago
Multiply or divide as indicated. Y^-9•y^-8•y^10
BabaBlast [244]

Answer:

1 / y^7

Step-by-step explanation:

Y^-9•y^-8•y^10

= y^10 / y^9•y^8

= y^10 / y^17

= 1 / y^7

8 0
3 years ago
What is the value of x in trapezoid ABCD?<br>x=15<br>x=20<br>x=45<br>x=60<br>​
Zepler [3.9K]

Answer:

I think its x=15

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
Other questions:
  • How do i calculate my class rank? There is 249 students in my class and i’m 126, what percentage would that be ?
    13·1 answer
  • If a figure is a trapezoid, in what other way or ways can you classify it?
    7·2 answers
  • Which expression is equivalent to am = a"? (4 points)
    9·1 answer
  • Point G is on line segment FH. Given FG = 8 and GH = 11, determine the length FH​
    9·1 answer
  • The total revenue R (in dollars) is directly proportional to the number of units sold x. When 500 units are sold, the total reve
    7·1 answer
  • Complete the equivalent ratio. How many ounces are in 2 cups?
    7·1 answer
  • What expression is equivalent to 30 divided (3 + x)
    9·1 answer
  • Two dice, a red and a blue, are rolled. Find the probability that both dice show sixes​
    5·1 answer
  • If my teacher has 45 hair pieces and she cuts 38 how many does she have left
    5·1 answer
  • What is the slope of 4x-3y=18
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!