1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
pickupchik [31]
3 years ago
12

Given: Triangle ABC with vertices A(5,-2), B(5.-7), and C(1, -2). Which set of

Mathematics
1 answer:
BigorU [14]3 years ago
6 0

Answer: C (0,0), (-4,0) and (0, -5)

Step-by-step explanation:

You might be interested in
Match each question to the correct problem.
Maslowich
<h2>Answer:</h2>

<em>(Check attached images).</em>

<h2>Step-by-step explanation:</h2>

<h3>Exercise 1.</h3>

a. Convert to decimals.

To order the numbers from least to greaters, convert them to decimals and compare.

5.2(percent)=0.052\\ \\\frac{1}{7} =0.1429\\\\ -0.8=-0.8000\\ \\\frac{-11}{5} =-2.2

b. Select the second least number.

-0.8.

<h3>Exercise 2.</h3>

a. Convert to decimals.

-3.4(percent)=-0.034\\ \\-0.031\\\\ -0.2\\ \\-\sqrt{0.8}= -0.8944

b. Select the correct number.

-\frac{1}{5}.

<h3>Exercise 3.</h3>

a. Convert to decimals.

<em>After seeing that there are negative and positive numbers, and with the premise that negative numbers are </em><u><em>always</em></u><em> lesser than positive numbers, we'll only compare the positive numbers.</em>

<em>59%=0.59</em>

<em>3/5=0.6</em>

<em />

b. Select the correct number.

3/5.

<h3>Exercise 4.</h3>

a. Convert to decimals.

-0.35

-3.5%= -0.035

b. Conclude.

Seeing that -3.5% is less than -0.35, the symbol that makes the statement true is ">".

<h3>Exercise 5.</h3>

a. Try to visually estimate b.

B appears to have a value of -0.9.

b. Convert the numbers to decimals.

-3.4%= -0.034

-0.031

-1/5= -0.2

-\sqrt{0.8}= -0.8944

c. Select the correct answer.

<em>Since we estimated the value of b as -0.9, the number that best adequates to its value is </em>-\sqrt{0.8}.

<h3>Exercise 6.</h3>

a. Convert to decimals.

<em>After seeing that there are negative and positive numbers, and with the premise that negative numbers are </em><u><em>always</em></u><em> lesser than positive numbers, we'll only compare the positive numbers.</em>

5.2%= 0.052

1/7= 0.1429

b. Select the correct number.

5.2% is the second largest.

<h3>Exercise 7.</h3>

a. Convert to decimals.

6/7= 0.857143

0.857

b. Select the correct answer.

Seeing that 0.857 is marked as an approximate by the

ellipsis,  and considering that 6/7 is an irrational numbers, we can conclude that the number that better fits the situation and makes the statement true is "=".

<h3>Exercise 8.</h3>

a. Convert to decimals.

<em>After seeing that there are negative and positive numbers, and with the premise that negative numbers are </em><u><em>always</em></u><em> lesser than positive numbers, we'll only compare the negative numbers.</em>

<em>-4.6</em>

<em />-\sqrt{21} =-4.5826

b. Select the correct answer.

The smallest number is -4.6.

7 0
1 year ago
Which equation in point-slope form contains the point (-3,5) and has slope -1?
andrezito [222]
Hello : 
<span>equation in point-slope form : y - 5 = -1(x -(- 3))
y - 5 = - (x+3)</span>
3 0
3 years ago
A number +5 more than three times the number is 37 find the number
xz_007 [3.2K]

Answer: 10 \frac{2}{3}

A number: x

Equation: 3x+5=37

Subtract 37-5=32

Divide 32/3= 10 \frac{2}{3}

4 0
1 year ago
For the scenarios presented in Problems 9–17, identify a problem worth studying and list the variables that affect the behavior
Nastasia [14]

Answer:

Problem: A company with a fleet of trucks faces increasing maintenance costs as the age and mileage of the trucks increase

Identify a problem worth studying : Yes, this problem is worth studying as it illustrate the classical optimization problem where to either minimize or maximize the outcome given some constraints. In this problem we need to maximize our profit by minimizing our maintenance cost give the age of trucks.

List the variables that affect the behavior you have identified: Lease expense, license, taxes, insurance, number of trucks, number of mechanics, type of fuel, maintenance and repair, labor, number of breakdowns, wait time to repair, loss of revenue and delay penalties, drivers retention and attrition, and number of customer reviews (negative and positive) the service.

Which variables would be neglected completely: Unless there are plans to relocate to different state with different regulations, the following variables can neglected completely: Lease expense, licenses and permits, taxes, insurance, number of trucks, number of mechanics, type of fuel.

Which might be considered as constants initially: Assuming that our mechanics are full time employees, the labor cost can be considered constant. However, the parts and materials associated with the labor are not constant. And any one time cosmetic fixes can be considered constants such as a small paint job or seat cleaning.

Can you identify any sub models you would want to study in detail?: The sub model that I want to study in more detail is as follow:

Truck ownership cost=truck depreciation+truck Return on Investment (ROI)

As the truck depreciation is constant, the main focus will be on truck Return on Investment (ROI).

Truck Return on Investment (ROI)=(the gain from the truck−Cost of investment)/cost of investment.

Hence the detailed subsystem can be as follow:

Cost of investment=(Fuel cost +maintenance cost +breakdown cost+wait cost).

Identify any data you would want collected:  The data you would want collected is maintenance cost and type of maintenance and specifically the tracks and truck parts that break down the most. The wait time needed to fix and maintain the trucks. And finally customer reviews. In other words, I would collect any data that directly or indirectly impact revenues. With the collected data, I would well informed about the best time to decide replacing trucks that are performing very poorly and negatively impacting the bottom-line of the company.

Step-by-step explanation:

The specific problem is selected above and it is worth analyzing and studying because is is similar to a classical optimization problem. This is because the desired output can be either maximized or minimized by adjusting the values of certain constraints such as maintenance cost, trucks parts and other necessary parameters.

8 0
3 years ago
You read online that a 15 ft by 20 ft brick patio would cost about $2,275 to have professionally installed.
irina1246 [14]

Answer:

Step-by-step explanation:

yes

5 0
3 years ago
Read 2 more answers
Other questions:
  • MATH HELP LEASE! WILL GIVE BRAINLIEST!
    11·2 answers
  • The inequality x - y &gt; 0 is satisfied by point (-1, 1). <br> a. True <br> b. False
    6·2 answers
  • 1) the point where the x abd y axis meet 2) if m&lt; A + m&lt;D = 90, then &lt;A and D are ____ angles 3) an angle formed by opp
    12·1 answer
  • There are 2 different jobs Jordan is considering. The first job will pay her$4200 per month plus an annual bonus of $4500. The s
    9·2 answers
  • An angle measures 10° more than the measure of its complementary angle. What is the
    7·1 answer
  • Enlarge the rectangle.
    5·2 answers
  • Good night everyone : )
    12·1 answer
  • Help me w this math question! pleaseee
    14·2 answers
  • The weight of a basketball is normally distributed with a mean of 17oz and a standard deviation of 2oz.
    10·1 answer
  • Find the leading coefficient and write the factored form of the function of least degree for the polynomial in the graph below.
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!