1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
anyanavicka [17]
3 years ago
12

An infinite cylindrical rod falls down in the middle of an infinite tube filled with fluidat a constant speed V (terminal veloci

ty). The density of the rod and the fluid are different.Assume that the pressure field is hydrostatic.(a)[5pts] Solve for the velocity profileas a function of rin terms of V and the other variables.(b)[2pts] Calculate upward force per unit length of the rod from the fluid wall shear stress on the rod.(c)[2 pts] Calculate upward force per unit length of the rod from bouyancy.(d)[1pts] Calculate V.VR1
Engineering
1 answer:
Oksana_A [137]3 years ago
7 0

Answer:

the speed of your poop

Explanation:

You might be interested in
Consider the freeway in Problem 1. At one point along this freeway there is a 4% upgrade with a directional hourly traffic volum
ryzh [129]

Answer:

The Question is incomplete, the complete question is as follows:

<em>Consider the freeway in Problem 1. At one point along this freeway there is a 4% upgrade with a directional hourly traffic volume of 5,435 vehicles. If all other conditions are as described in Problem 1, how long can this grade be without the freeway LOS dropping to F? </em>

A six-lane rural freeway (three lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The base free-flow speed is 65 mi/h, lanes are 11 ft wide, the right-side shoulder is 4 ft wide, and the interchange density is 0.25 per mile. The highway is one rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. Determine the hourly volume for these conditions

Explanation:

<em>Make the assumption Base continuous flow velocity (BFFS)= 65 mph. </em>

Pitch width= 11 ft.

Decrease in lane width pace,fLW= 1.9 mph.

Complete Lateral clearance= 4 ft. Lateral clearance speed reduction, fLC= 0.8 mph.

Complete Width of the Ramp= 0.25 mile.

Velocity reduction proportional to the ramp height, f ID= 0 mph.

Assume lane number to be = 3.

Reduction in speed corresponding to no. of lanes, fN = 3 mph

Free Flow Speed (FFS) = BFFS – fLW – fLC – fN – fID = 65 – 1.9 – 0.8 – 3 – 0 = 59.3 mph

Peak Flow, V veh/hr

Peak-hour factor = 0.90

Trucks = 10%

Rolling Terrain

fHV = 1/ (1 + 0.10 (2.5-1)) = 1/1.15 = 0.8696

fP = 1.0

Peak Flow Rate, Vp = V / (PHV*n*fHV*fP) = V/ (0.90*3*0.8696*1.0) = 0.426V veh/hr/ln

Average speed of vehicles, S = FFS = 59.3 mph

Level of service C

Density of LOS C lies between 18 - 25 veh/mi/ln

Maximum density = 25 veh/mi/ln

Density = V​​​​​​p /S = 25

0.426V = 25 * 59.3

V = 3480 veh/hr

b) V = 5435 veh/hr

LOS dropping to F

Max density = 45 veh/mi/ln

Density = Vp/S = 45

V​​​​​​p = 45 * 59.3 = 2668.5 veh/hr/ln

V/(PHF * n * f​​​​​​HV * f​​​​​​P​​​) = 2668.5

f​​​​​​HV = 5435/(0.9*3*2668.5*1.0) = 0.754

1/(1+0.10 (E​​​​​​T -1)) = 0.754

E​​​​​​T = 4.26 ~ 3.5

<em>For 4% upgrade and 10% trucks with E​​​​​​T = 3.5, length of the grade is Greater than 1.0 miles</em>

6 0
3 years ago
Read 2 more answers
A furnace uses preheated air to improve its fuel efficiency. Determine the adiabatic flame temperature when the furnance is oper
balu736 [363]

Answer:

2543 k

Explanation:

This problem can be resolved by applying the first law of thermodynamics

<u>Determine the adiabatic flame temperature</u> when the furnace is operating at a mass air-fuel ratio of 16 for air preheated to 600 K

attached below is a detailed solution

cp = 1200

8 0
3 years ago
Request for proposal (RFP) is a type of document that contains the information and proposals mostly through the bidding process.
Art [367]

Answer:

Answer to the following is as follows;

Explanation:

A request for proposal is a documentation that invites prospective contractors to submit business opportunities to an agency or corporation interested in procuring a commodities, product, or valuable resource through a bid procedure.

A request for proposal (RFP) is a commercial document that introduces a project, defines it, and invites eligible contractors to compete on its completion.

8 0
3 years ago
A machine raises 20kg of water through a height of 50m in 10secs. What is the power of the machine.​
Tomtit [17]

Answer:

hhahhhwghwhwhwhwjwnwjnnnnwnwwnw

Explanation:

jwkwkkwoiwiwiwiwiwowwiwowowiiiiwuuwuwgeevehehsvhsvwhbhhehehwgjjwhwhjwjqwjjuuuwi####!\\\\e

5 0
3 years ago
Assume the following LTI system where the input signal is an impulse train (i.e.,x(t)=∑????(t−nT0)[infinity]n=−[infinity].a)Find
Igoryamba

Answer:

See explaination

Explanation:

The Fourier transform of y(t) = x(t - to) is Y(w) = e- jwto X(w) . Therefore the magnitude spectrum of y(t) is given by

|Y(w)| = |X(w)|

The phase spectrum of y(t) is given by

<Y(w) = -wto + <X(w)

please kindly see attachment for the step by step solution of the given problem.

4 0
3 years ago
Other questions:
  • Which situation might cause potential hazards at a construction site?
    12·2 answers
  • A large prime number isP = 232582657 - 1
    8·1 answer
  • In a reversible process both the system and surrondings can be returned to their initial states. a)-True b)-False
    14·1 answer
  • 1. The area of the given triangle is 25 square units. What is the value of x?<br> X+2
    8·1 answer
  • Determine the design angle ϕ (0∘≤ϕ≤90 ∘) between struts AB and AC so that the 400 lb horizontal force has a component of 600 lb
    10·1 answer
  • What did Congress do in 1787 to settle land disputes among the settlers?
    11·1 answer
  • What energy type is represented in the picture?
    6·2 answers
  • Implement a program that manages shapes. Implement a class named Shape with a method area() which returns the double value 0.0.
    8·1 answer
  • It is acceptable to mix used absorbents.
    15·1 answer
  • ceramics must be heated in order to harden the clay and make it durable. the equipment used to heat the clay
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!