Answer:
85 m
Step-by-step explanation:
5696/67=85
Answer:
1.5 batches take 12.375 hour
Step-by-step explanation:
The first batch takes 10.5 hours, meaning only .5 batches are left. You then take the time that each new full batch takes (4.25) and divide it by 2 as you only need half of one batch. Meaning 0.5 of a batch takes 2.125 hours. You then take the time of the two batches (10.5, and 2.125) and add them, leaving you with 12.625. Meaning 12.375 is the most viable answer.
Answer:
1. false
2. true
3. true
4. true
5. true
6. false
Step-by-step explanation:
sub to tapl :L
Answer:
The mean of the total repair time is 150 minutes.
The variance of the total repair time is 725 minutes^2.
Step-by-step explanation:
To solve this problem, we have to use the properties of the mean and the variance. Our random variable is the sum of 3 normal variables.
In the case, for the mean, we have that the mean of the sum of 3 normal variables is equal to the sum of the mean of the 3 variables:

For the variance, we apply the property for the sum of independent variables (the correlation between the variables is 0):

HEY DEAR
given:- cost price = £108000
profit = 14%
sp=?
SP = (100+profit% / 100 )× cp
SP= (100 +14% /100)× £108000
SP= 114/100 × 108000
HOPE ITS HELPFULL