If it's a cube, each side (6 sides) is 8x8. So 8x8 is 64, 64 times 6 is 384 square inches. Does that seem right to you??
Hello there,
In order to find the equation you would need to use the slope intercept form:
Now we plug in and solve for the slope:
=
Now we plug into y = mx + b to solve for the y-intercept:
- 0 = -
(0) + b which gives you 0 for the y-intercept
So the equation would have to be y =
+0 or just y =
Hope I helped,
Amna
Answer:
62.5%
Step-by-step explanation:
im right
You want to do to one side the same thing you do to the other side.
In order to get the n by itself you divide the 25n by 25. But in order to not change the answer you need to do the same to the 70.

so n=

which can be reduced to

so n=
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.