Answer:
$896
Step-by-step explanation:
We are given that
Charge of 1 yard for each custom-made banner=$28
Length of 1 piece=15 yards
Length of another piece=2 yards
We have to find that how much money payed by Ms.Gill for all three banners.
According to question
Cost of 15 yards long banner=$420
Cost of 2 piece of 15 yards long banner==$840
Cost of 2 yards long banner==$56
Total cost of 3 piece of banners=840+56=$896
Hence, Ms gill pay for all three banners=$896
Your Welcome;)
Answer:
Step-by-step explanation:
1 Simplify 19-7 to 12.
12^2−8×3+4×3−5
2 Simplify 12^2 to 144
144−8×3+4×3−5
3 Simplify 8×3 to 24.
144−24+4×3−5
4 Simplify 4×3 to 12.
144−24+12−5
5 Simplify 144-24 to 120.
120+12-5
6 Simplify 120+12 to 132.
132-5
7 Simplify.
127
You add all of them together if it’s labeled with a X.
For example, the first X is 1 hour. If it has 2 Xs it would be 2 hours, if no X is shown above, it’s zero hours.
Answer is 12 hours.
Answer:
Step-by-step explanation:
In a geometric sequence, the nth term is
T_n = ar^(n-1)
a = first term
r = common ratio which can be gotten by dividing second term by first term, third term by second term etc
Therefore
a = 16
r = -3.2 ÷ 16
r = -0.2
T_7 = ar^(7-1)
T_7 = ar^6
T_7 = 16[(-0.2)^6]
T_7 = 16(0.000064)
T_7 = 0.001024
When we have a High Outlier in the data-set the line will extend from the Q3 to "Q3+1.5*IQR", which is considered the Maximum value, therefore the answer is True. The outlier will be a point outside this range.